Encyclopedia of range hoods

Air purifier information

NEWS INFORMATION

首页 > Case

Case Study: 460,000 CFM at Crown Resort Hotel in Putian, Fujian

Author:admin Date:2026-05-09

The Crown Hotel is designed, constructed, decorated, and equipped according to the standards of a four-star hotel. It integrates guest rooms, dining, entertainment, and business leisure, with advanced and complete facilities and luxurious and elegant decoration. The hotel stands at eleven stories, covering an area of nearly 5,000 square meters and a building area of over 20,000 square meters.

I. Introduction to the installation and matching case project of Guanglan Environmental Protection's catering fume purification system

This project aims to install a fume purification system at the Crown Resort Hotel in Putian, Fujian, to ensure that the fume emissions from the hotel's catering section meet environmental standards, safeguard the air quality around the hotel, and enhance the dining experience for customers.

Guanglan Environmental Protection Company, a renowned domestic supplier of fume purification equipment, boasts extensive experience in the design and installation of fume purification systems. Based on the project requirements, Guanglan Environmental Protection Company conducted a detailed on-site inspection and needs analysis, and tailored a fume purification installation plan specifically for the Crown Resort Hotel in Putian, Fujian.

II. Purification Project Plan

1. Oil smoke volume assessment and equipment selection

Based on the scale and daily operation of the hotel's catering section, Guanglan Environmental Protection Company has assessed the amount of cooking fume generated to determine the processing capacity required for the cooking fume purifier. After assessment, the cooking fume treatment demand for the Crown Resort Hotel in Putian, Fujian is 460,000 cubic meters per hour

2. Installation location and space reservation

The fume purifier should be installed at an appropriate location on the smoke exhaust duct, as close to the smoke source as possible, to ensure that the fumes are fully purified before being discharged. Taking into account the hotel's building structure and smoke exhaust duct layout, Guanglan Environmental Protection Company selected a suitable installation location and reserved sufficient space for installation and maintenance, ensuring the normal operation of the equipment and convenient maintenance.

3. Pipeline layout and material selection

The layout of the smoke exhaust ducts is designed reasonably to ensure that the fumes can be smoothly discharged into the purifier and then expelled. In the duct layout, the flow characteristics of the fumes and the resistance loss of the ducts are taken into account to optimize the duct layout and reduce energy consumption and noise.

4. Equipment installation and debugging

Upon arrival of the equipment at the site, an inspection will be conducted to ensure its integrity and to verify the model and accessories. In this project, Guanglan Environmental Protection Company has provided a comprehensive set of equipment, encompassing oil fume purifiers, pipelines, and accessories, and has dispatched a professional team for on-site guidance and supervision

5. Purification Effect and Operational Stability Testing

After the equipment installation and commissioning were completed, Guanglan Environmental Protection Company conducted tests on purification efficiency and operational stability. Through no-load and load test runs, the company observed the equipment's operating status and purification efficiency to ensure that they met the expected results. At the same time, the oil fume concentration at the exhaust outlet was also tested to ensure compliance with the emission standards set by the environmental protection department The oil fume purification installation project for the Crown Resort Hotel in Putian, Fujian, stands as a successful case study, fully showcasing Guanglan Environmental Protection Company's professional expertise in the design and installation of oil fume purification systems. Through a scientifically sound and rational engineering plan, the hotel effectively addressed the issue of oil fume emissions, ensuring a fresh kitchen environment and enhancing the dining experience for customers. Simultaneously, this project serves as a valuable reference and insight for other hotels and catering enterprises During the project implementation process, Guanglan Environmental Protection Company fully considered the actual situation and operational needs of the hotel and provided a customized solution. Through a series of processes including on-site inspection, demand analysis, equipment selection, installation, and debugging, the smooth implementation and high-quality completion of the project were ensured

 

tagsRelated tags:
Oil fume purifier case

Recommend